Barmesa Municipal Lift Station Retrofit Case Study
Barmesa Municipal Lift Station Retrofit
A municipal wastewater facility upgraded aging sewage pumps with Barmesa solids-handling systems to reduce clogging and improve runtime reliability.
Application
- Municipal wastewater lift station
- High ragging conditions
- Duplex guide rail system
- Frequent clogging events
Installed Equipment
- Barmesa 2BSE solids-handling pumps
- Guide rail discharge system
- Updated float controls
- Corrosion-resistant hardware
Results
- Reduced emergency maintenance calls
- Improved solids passage reliability
- Reduced pump downtime
- Improved wastewater flow handling